Group Name:
3RDiConstruction
Group Topic: Planning
Grade: DN
Grade: DN
Clarity of the oral
presentation
The oral presentation of the group was very clear and
concise to communicate the appropriate group theoretical position. Each group
member presents a clear meaning of each topic. There is a connection between
the definition of the planning and its theory to the project. This shows the
understanding of the concept and research depth of their works. The importance
of planning pointed out by every member to emphasize how important planning
process is.
Clarity of the
written presentation
The
written information on the slide show was layout appropriately to show the list
of the topic. However there were too many texts and was hard to read from the
distance. Point form may be advantage at this stage. Some diagram such as
timeline supported the presentation very well. The overall written was well
organized and easy to understand.
Distinctiveness and
specificity of the examples
The example each member used was distinctive and specific. There
were some images and diagram as an example to the project although some image
are too small but with the explanation while presenting that gained more
understanding for the audience.
Reference
There was no any reference of any images, diagram and
contents. All the website, books, images and diagram are necessity referenced.
Reference is very important to show the acknowledgement and credit the creator
in terms of keeping the right for individual intellectual property.
The conceptual
context
Presentation has demonstrated that each member has a clear
understanding on the concept of planning. All the members can identify the
planning process in which involve in their roles.
The still image
There were not much of an image in the presentation but some
of it that they used was quite effective. The most effective element is the
grant chart of the timeline. That demonstrated the plan of their group.
Applying to my group planning, with a clear plan of role
allocation and applying a dead line for each subtask will help keep all the
members on the track. Our group has created Asana planning page to indicate the
time where we need to get each task done to be on time. All the members then
need to keep up with the schedule and their responsibilities to satisfy the
project plan.